Marina & Business
Scalable facilities for ports, marinas, and projects
We design complete modular marina solutions for marinas, ports, municipalities, clubs, and marine contractors.
-
More Capacity
More boat berths and revenue without heavy investment in facilities.
-
Fast delivery
Modular installation without pile driving — in operation in record time.
-
Low total cost
Maintenance-free systems with decades of service life.
-
Full design
Consultation from initial sketch to finished installation.
Commercial blocks
One block system.
Countless commercial properties.
The same HDPE blocks are connected to create a wide variety of structures — ports, clubs, municipalities, and contractors build, modify, and expand according to their needs.
- Extra berths during high season
- Construct temporary block spaces when demand peaks, and dismantle them again outside of the season.
- Floating Bridges and Walkways
- Connect blocks to form bridges of the width and length required by the harbour — with a non-slip surface all the way.
- Service dock for jet skis and small boats
- The vessel is rolled out of the water on the built-in rollers, allowing for dry rental, preparation, and cleaning.
- Work and assembly platforms
- Contractors are building a stable working platform on the water for inspection, repair, and construction work.
- Event and Activities Deck
- Clubs, municipalities, and resorts collect blocks for swimming platforms, kayak launching, and event stages.
- Rental Fleet and Training
- Fixed pick-up points for SUPs, kayaks, and rental vessels with safe embarkation and disembarkation.

HDPE modular system · Nordic waters
Economy
Floating dock vs. concrete.
Same function — the fraction of the price.
A cast concrete bridge requires a contractor, pile driving, crane, and heavily regulated design. A modular MDOCK system is delivered on a pallet and assembled on-site — typically in less than a day. The figures below are empirical values for a system of approx. 50 m²; we always provide a specific estimate for your project.
Swipe sideways to see the whole table
| Parameter | Concrete bridge / quay facility | MDOCK floating dry dock |
|---|---|---|
| Construction cost (approx. 50 m²) | DKK 600,000 – 1,200,000 | DKK 150,000 – 300,000 |
| Savings | — | Typically 60–75% |
| Construction period | 6–16 weeks with a contractor | 1–2 days with your own crew |
| Foundation | Pile driving, casting, crane | None — the plant is floating |
| Authorities | Heavy casework, permanent facility | Minor case, often temporary construction |
| Annual maintenance | Cracks, frost damage, reinforcement | Flushing — HDPE does not rust or rot |
| Lifespan | 20–40 years, cannot be changed | 20+ years, can be continuously rebuilt |
| Relocation / Expansion | Demolition and recasting | Will be reconnected in hours |
| Winter Storage | Not possible | Taken up and stored ashore |
| Residual value | Zero at demolition | Blocks can be reused or sold |
- 60–75% lower installation cost than a cast solution
- 1–2 days from delivery until the facility is in operation
- DKK 0 for foundation, piling, and crane work
Prices are indicative experience figures excluding VAT and depend on size, location, wave conditions, and accessories.

Collaboration
A collaboration from idea to operation
Our business team handles the entire process — from measurement and sizing to delivery, installation, and handover.
- Needs analysis and capacity planning
- Design for local wave and ice conditions
- Design, quotation, and schedule
- Delivery and professional installation
- Service and expansion over time
Dealers
Find your local MDOCK dealer
Drop by or call us for personalized advice about your project.
Shall we design your system?
Contact our business team for a no-obligation discussion about your marina or harbour project.